| Sign In | Join Free | My insurersguide.com |
|
1. Easyand fast installation into the extruded tee by insert and turn.
2. Apply both on the upside of the extrusion tee and the bottom side to fix the cable traysystem.
Q235B material for strong load
Ni coating for good corrosion performance
Positiong head for quick positioning by insert into the hole on the structural tee
|
|
Structural Grid Ceiling-Positioning T bolt Quick positioning in Extrusion Structural Tee Images |